Freelance Change Request Template

The document that turns “could you just…” into a decision with a number attached. What changed, what it costs, how many days it adds, and a box for approved, declined or deferred — on one page, before the work starts.

Who it is for. Freelancers with a signed scope who have just been asked for something that is not in it.

Download this template

Free · No signup · No email · Version 1.0, updated September 2026

The files are generated when the site is built and served as ordinary static downloads. Nothing you type into them is ever sent anywhere — once the file is on your machine it has no connection to Freshlance at all.

What the file looks like

This preview is generated from the same definition the downloads are built from, so what you see here is what opens. Placeholders like {{CLIENT_NAME}} are shown exactly as they appear in the document.

Change request — document preview1 page

CHANGE REQUEST

{{CHANGE_REQUEST_NUMBER}} · {{PROJECT_NAME}}

Project
{{PROJECT_NAME}}
Client
{{CLIENT_NAME}}
Original scope reference
{{SOW_REFERENCE}}, dated {{SOW_DATE}}
Request date
{{REQUEST_DATE}}
Requested by
{{REQUESTED_BY}}
Prepared by
{{FREELANCER_NAME}}

Impact summary

ImpactChange
Additional effort+12 hours
Additional cost+$900.00
Schedule impact+4 working days
Current target date20 October
Revised target date24 October
StatusAwaiting approval

No work on this change begins until the decision below is signed. The figures above assume approval by {{DECISION_BY_DATE}}; after that date the schedule impact may increase.

What is being requested

{{CHANGE_DESCRIPTION}}

Why

{{CHANGE_REASON}}

Original requirement versus new requirement

ItemOriginally agreedNow requested
Product page templatesThree templatesFour templates
Revision roundsTwo per deliverableTwo per deliverable (unchanged)
{{ITEM_3}}{{ORIGINAL_3}}{{REQUESTED_3}}

Deliverables affected

  • {{AFFECTED_DELIVERABLE_1}}
  • {{AFFECTED_DELIVERABLE_2}}

Additional effort and cost

ActivityHoursRateCost
Design of the additional template6.0$75.00$450.00
Build and responsive testing4.5$75.00$337.50
Revision round and review1.5$75.00$112.50
Total additional cost12.0$900.00

Timeline impact

Working days added
4
Milestones affected
{{AFFECTED_MILESTONES}}
Current target date
{{CURRENT_TARGET_DATE}}
Revised target date
{{REVISED_TARGET_DATE}}

The schedule impact is longer than the hours alone because the additional work has to fit around commitments already scheduled. Twelve hours of work is not twelve hours of calendar.

Dependencies and risks

  • Content for the additional template is supplied by {{CONTENT_DATE}}.
  • {{DEPENDENCY_2}}
  • Risk: {{RISK_1}}

Decision

Please mark one option, sign and return.

  • Approved — proceed as described above
  • Approved with changes — see notes below
  • Declined — the project continues as originally scoped
  • Deferred — revisit on {{DEFER_DATE}}

Notes: {{DECISION_NOTES}}

Approval

Approved for {{CLIENT_NAME}}

Signature
Name
Date

For {{FREELANCER_BUSINESS}}

Signature
Name
Date

Once signed, attach this to the scope of work. The revised dates and total replace the ones in the original document.

Freshlance Template · version 1.0 · freshlance.app/templates/freelance-change-request-template

What is included

  • An impact summary at the top

    Additional hours, additional cost, working days added, the new target date and the current status — the five numbers a client needs to decide, above the explanation.

  • Original versus new, side by side

    What was agreed and what is now being asked for, in one table, so the change is visible rather than argued about.

  • Effort broken down

    By activity, with hours and cost, because “+$900” with no working is a number clients push back on.

  • A decision box

    Approved, approved with changes, declined, deferred — with a signature and a date.

How to use it

Five steps, in the order that keeps the work out of trouble.

  1. 1

    Fill it in as soon as the request arrives, while the conversation is still fresh — not once you have already spent four hours on it.

  2. 2

    Be specific in the original-requirement column. Quote the scope document.

  3. 3

    Break the effort down by activity. A broken-down figure is discussed; a single number is negotiated.

  4. 4

    Include the schedule impact even when it is zero. A change that costs money but no time is worth saying out loud.

  5. 5

    Send it and wait for the decision before starting. That sentence is the entire value of the document.

The worked example

The worked example adds a fourth product-page template to a redesign: +12 hours, +$900, four working days, and a revised delivery date, awaiting approval.

The example content is filled in throughout the preview above, so you can see the shape of a finished document before you start on your own.

What to change

The parts that are deliberately yours to decide.

  • Your change-request rate

    Some freelancers price change requests at their standard rate; some add a premium because unplanned work displaces planned work. Either is defensible — decide before you need to.

  • A minimum threshold

    If you absorb anything under an hour, say so on the form. It makes the ones you do raise easier to accept.

  • The deferred option

    Useful, and often the honest answer: worth doing, not worth doing now. Keep it unless your projects are too short for it to mean anything.

  • Numbering

    CR-01, CR-02 against the project reference. The third one is where numbering starts to matter.

About the formats

What differs between the files, and why you might pick one over another.

DOCX
Word, on one page for a typical change, with the impact summary as a table at the top.
ODT
Generated natively for LibreOffice Writer.
PDF
For sending, and for attaching to the scope document once it is signed.

Questions

Should I charge for every change?
No — absorbing genuinely trivial things is good business and good manners. Raise a request when the change adds real time, when it revisits something already approved, or when it is the fifth small one.
What if the client refuses to sign change requests?
That is worth knowing early. A client who will not put a change in writing is a client who will not remember agreeing to it. The change-control clause in the scope document is what you point at.
Does a change request need a new contract?
Usually not. It amends the scope of work, which the contract refers to. That is why the scope is an attachment rather than part of the contract body.
What about changes that save time?
Use the same form with negative hours. A client who sees a credit for descoped work takes the additions considerably better.

Download it

Download this template

Free · No signup · No email · Version 1.0, updated September 2026

The files are generated when the site is built and served as ordinary static downloads. Nothing you type into them is ever sent anywhere — once the file is on your machine it has no connection to Freshlance at all.